Picton has a housing supply problem. The town is the commercial and administrative centre of Prince Edward County, tourism has grown rapidly over the past decade, and the resulting demand for short-term rentals has tightened the long-term rental market. Secondary suites are one of the most practical ways to add rental housing without new subdivision development. Prince Edward County has recognized this: its zoning by-law now allows up to two additional units on most lots with a house, and qualifying units are exempt from development charges. Cottage Country Contracting & Property Maintenance Group builds secondary suites and in-law apartments in Picton and throughout Prince Edward County.
Secondary Suite Funding
Prince Edward County ran a Secondary Suites program in 2022 and 2023, funded with $200,000 from its affordable housing reserve. It offered $25,000 interest-free, forgivable loans to property owners who built or renovated a suite, in return for renting it as affordable long-term housing for 15 years. Four loans were funded in the first round and the rest of the money was carried into a second intake in 2023. The program is not listed among the County’s current housing resources, so before counting on funding, ask the County’s Housing Department (613-476-2148 ext. 1529) whether a new intake is open. The County’s page for landlords and housing providers lists the supports available now, including affordable housing programs through Prince Edward Lennox and Addington Social Services.
Zoning Requirements
The County’s Comprehensive Zoning By-law 140-2025, in effect since November 10, 2025 and replacing By-law 1816-2006, calls secondary suites additional dwelling units. On a lot with a single-detached, semi-detached or townhouse dwelling, it allows up to two additional units, for three units in total, with no more than one of them in an ancillary building such as a garage or garden suite. An additional unit can’t be larger than 50% of the main home’s floor area unless it takes up the whole basement. It needs one parking space (tandem parking is allowed), must use the existing driveway, and can’t add a new doorway to the front wall of the house. Additional units are not permitted in a regulated floodplain. You can check your property’s zoning on the County’s online GIS map, or ask the Planning Division through its Development Inquiry Form.
Building Permits
Building permits are submitted through the County’s Cloudpermit online system, and the zoning by-law says an additional unit can’t be set up before a permit is issued. Plans must show the suite layout, dimensions, egress, fire separation between units, smoke and carbon monoxide alarms, and compliance with the Ontario Building Code, which sets the requirements for ceiling heights and bedroom egress windows in basement suites. The Building Department (613-476-2148 ext. 2040) reviews applications and will give you the list of inspections your project needs. Electrical work is inspected separately by the Electrical Safety Authority.
Heritage District Properties
If your property falls within the Picton Main Street Heritage Conservation District (By-law 3286-2013), any exterior changes require a heritage permit. Interior work to create a secondary suite generally does not require heritage approval, but if you are adding an exterior entrance, modifying windows, or altering the exterior in any way, the heritage permit process applies. The HCD designation does not require you to restore the property to a historical appearance; it focuses on preventing demolition and major exterior alteration. Meet with the County Planner before applying to confirm what is and is not affected.
Costs
A basement conversion in Picton typically runs $55,000 to $100,000. A garden suite or outbuilding conversion will be $130,000 to $220,000+ depending on the existing structure and site conditions. Qualifying second and third units are exempt from development charges, which keeps soft costs down. Properties in Picton are generally on municipal water and sewer, which simplifies the plumbing compared to rural properties on wells and septic systems. On a fully serviced lot, the zoning by-law requires the suite to connect to the water supply after the existing meter (one meter per lot) and to the main house’s building drain.
Get Started
Cottage Country Contracting & Property Maintenance Group builds secondary suites in Picton. We can help with funding applications when a program is open, permit submissions, and the construction itself. Contact us to discuss your property.