Lindsay’s rental market is tight. Between Fleming College students, hospital staff at Ross Memorial, and the steady stream of people moving to the Kawarthas for more affordable housing, demand for rental units consistently outpaces supply. Adding an Additional Residential Unit to your property is a practical way to generate income, house a family member, or simply make better use of your space. The City of Kawartha Lakes permits ARUs on qualifying residential properties, but requires them to be registered. Cottage Country Contracting & Property Maintenance Group designs and builds legal ARUs throughout Lindsay, handling the registration, permits, and construction.
The ARU Registration Requirement
The City of Kawartha Lakes requires every Additional Residential Unit to be registered under By-law 2020-162. This isn’t optional: the City treats an unregistered unit as illegal, regardless of how well it’s built. Registration includes an inspection by a Building Inspector, sometimes together with a Fire Prevention Officer, to confirm the unit meets the Ontario Building Code, the Fire Code and zoning. The register is also used by fire, police, and paramedics so they know the building contains more than one dwelling unit, and each registered unit is given its own address number.
Where ARUs Are Permitted
ARUs are allowed where the main home is a single-detached, semi-detached, or townhouse dwelling. In most of Kawartha Lakes, including Lindsay, you can have up to two ARUs per home: one inside the house (typically a basement apartment) and one in a detached accessory building such as a coach house or garden suite, or two inside the house. Each unit is registered individually. An ARU can’t be larger in floor area than the main unit, the main home still has to meet its zoning parking requirement, and ARUs aren’t permitted in floodplains, environmental protection zones, or other hazard lands. In Lindsay’s urban area, servicing means municipal water and sewer. On private services, the lot must be at least 0.4 hectares (1 acre), and the existing septic system will be reviewed; it often needs an upgrade to handle the added load.
Building Code Requirements
The Ontario Building Code sets the safety floor. A fire separation between units is mandatory. When an existing house is converted, the Code’s compliance alternatives generally allow a 30-minute separation, reduced to 15 minutes if the whole house has interconnected smoke alarms; new construction is held to the full Part 9 requirements. Every unit needs smoke and carbon monoxide alarms. Bedroom windows that serve as an emergency exit must provide at least 0.35 square metres of unobstructed opening, with no dimension under 380 mm. Ceiling height minimums apply to basement conversions. We assess all of this at the start of the project so you know what’s involved before any work begins.
The Permit Process
Building permit applications go through the City’s online permit portals. The Building and Septic Division has gone paperless, but paper applications can still be dropped off at the Development Services Hub, 180 Kent Street West in Lindsay, with a $15 record scanning fee. The City says it issues an ARU building permit within 10 business days of a complete application. Electrical work requires a separate ESA permit. We prepare the drawings, submit the applications, and manage the inspections through to the final registration.
Financial Picture
Provincial Bill 23 exempts additional residential units from development charges. Building permit fees are calculated under Schedule A of Building By-law 2024-219, and registration carries a one-time fee set in the City’s Consolidated Fees By-law. Rents in Lindsay change quickly, so check current listings for comparable units when you estimate how soon the unit will pay for itself.
We Handle the Full Process
Cottage Country Contracting & Property Maintenance Group builds registered ARUs throughout Lindsay. From the initial assessment through permits, construction, and final registration, we manage the entire project.
