Demolition is a precise science. Whether you are removing an old garage in Downtown Whitby to make way for a garden suite, or tearing down a farmhouse for a new build, the process is strictly regulated. Cottage Country Contracting & Property Maintenance Group manages demolition projects with a focus on safety and compliance.
The Permit Process
You cannot just knock a building down. In Whitby, you need a Demolition Permit. To get this, we must:
1. Utility Sign-Offs: Every service must be disconnected before the permit is issued. The Town’s demolition sign-off form needs signatures from Enbridge Gas, Elexicon Energy (hydro), Rogers, Bell, and the Region of Durham (water and sewer).
2. Site Plan: Show how debris will be contained and where the new grade will be.
3. Heritage Sign-Off: The Town’s Heritage division signs off on every demolition. If the building is on the Whitby Municipal Heritage Register, whether listed or designated, or sits in the Brooklin or Werden’s Plan Heritage Conservation District, the request can go to the Heritage Whitby Advisory Committee and Council, so it takes longer. For a listed property that isn’t designated, Ontario’s Heritage Act requires the owner to give Council at least 60 days’ written notice before demolition.
Environmental Hazards
Before demolition, a Designated Substance Survey (DSS) is required for most older buildings. This identifies asbestos, lead, mercury, and silica. If these are present, they must be abated (removed) by certified professionals before the heavy machinery comes in. We manage this abatement process to keep the site safe for workers and neighbours.
Complete Site Clearing
Our job isn’t done until the site is clean. We haul away all debris (wood, concrete, metal), remove foundations, and backfill the excavation with clean, compactable fill. We leave the site graded and ready for whatever comes next.
What to Expect in Whitby
- Applying: The Town accepts demolition permit applications through its E-Portal or by email, so we can submit as soon as the sign-offs are in.
- Deposits: The Town may hold deposits against damage to the curb, sidewalk, boulevard or a Town fence, so we protect them during the work.
- Hazardous materials: The Town’s form makes the owner responsible for consulting the Ministry of Labour about removing and disposing of hazardous substances. Our Designated Substance Survey and abatement plan cover this.
- Conservation areas: If the lot is near a creek, ravine, wetland or the Lake Ontario shoreline, backfilling and regrading can need a permit from Central Lake Ontario Conservation (CLOCA) under O. Reg. 41/24. We check CLOCA’s regulated-area map first.
- After demolition: The lot must be graded and levelled and kept to the Town’s property standards until the next project starts.
Professional Demolition
Cottage Country Contracting & Property Maintenance Group handles the permits, the hazards, and the heavy lifting.
