Demolition projects in Trenton range from taking down a derelict garage to clearing an entire structure to make way for new construction. The permit requirements are straightforward, but there are steps that need to happen in the right order. Skipping utility disconnection, hazardous material assessment, or conservation authority review can create problems that cost more than the demolition itself. Cottage Country Contracting & Property Maintenance Group provides demolition services throughout Trenton and Quinte West.
The Permit Process
A demolition permit is required from the City of Quinte West through Building Services. The application (“Application for Permit to Construct or Demolish”) requires a copy of the property survey noting what is to be demolished, the required supporting documents, and the applicable fee. Applications and payment can also be made online through the City’s e-permit system. Before applying, you need to call Ontario One Call at 1-800-400-2255 to locate buried utilities and contact the applicable conservation authority if the property is within a regulated area.
Utility Disconnection
All utilities must be formally disconnected before demolition begins. This includes Hydro One or the local electricity distributor, natural gas (Enbridge), water and sewer (municipal), telephone, and cable. Each utility has its own disconnection process and timeline. Hydro One in particular can take several weeks to schedule a disconnection, so starting this process early is important. Demolishing a structure with live utilities connected is both illegal and dangerous.
Conservation Authority
Properties within the regulated area of Lower Trent Conservation (613-394-4829) or Quinte Conservation (613-968-3434) may need a conservation authority permit under O. Reg. 41/24 before demolition, because removing a structure, moving material and regrading near the water can all count as development. This is particularly relevant for waterfront properties in Trenton. The conservation authority will want to know how the demolition will be managed to prevent sediment, debris, and contaminants from entering the waterway, and what the plan is for the site after the structure is removed.
Hazardous Materials
Before demolition begins, the structure needs to be assessed for hazardous materials. Common findings in Trenton-area buildings include asbestos (insulation, floor tiles, siding, roofing), lead paint (pre-1980 buildings), and abandoned heating oil tanks. Hazardous materials must be removed by qualified contractors before general demolition. This is a regulatory requirement and an environmental protection measure. We coordinate the hazardous material assessment and abatement as part of the demolition project.
Heritage Properties
If the property is designated under the Ontario Heritage Act, demolition needs Council’s consent in addition to the building permit, and Council consults the City’s Heritage Advisory Committee before deciding. Start with the planning staff ([email protected]), who can confirm the property’s status and explain the heritage process. If the property is listed on the municipal heritage register but not designated, the owner must give the City at least 60 days’ written notice before demolishing, which gives Council time to consider designation. Check the heritage status before you set a schedule.
Get a Demolition Quote
Cottage Country Contracting & Property Maintenance Group handles demolition projects in Trenton, from permit applications through to site restoration. We coordinate utility disconnection, hazardous material assessment, and conservation authority review. Contact us to discuss your project.