New construction and additions in rural Prince Edward County involve a web of zoning provisions that reflect the County’s dual identity as an agricultural community and a tourism destination. The zoning by-law, conservation authority regulations, and Ontario’s provincial policies on farmland protection all shape what can be built, where, and how large. Projects range from building a new home on a vacant rural lot to adding a tasting room to a winery to constructing agricultural buildings for farming operations. Each type of project follows a different regulatory path. Cottage Country Contracting & Property Maintenance Group handles new construction and additions throughout rural Prince Edward County.
Zoning By-law 140-2025: Rural and Agricultural Zones
Prince Edward County adopted Zoning By-law 140-2025 in November 2025, replacing the County-wide Comprehensive Zoning By-law 1816-2006. The Agricultural (AG) zone requires a minimum lot area of 40 hectares (approximately 100 acres), while the Rural (RU) zone requires 10 hectares (approximately 25 acres). These minimum lot sizes mean that lot creation through severance is extremely limited in both zones, and most new construction will occur on existing lots. The by-law sets maximum lot coverage, building height, and setback requirements for each zone. In the AG zone, permitted uses include farming, a single detached dwelling, and agricultural buildings and structures.
On-Farm Diversified Uses (OFDU)
One of the more significant provisions in the County’s planning framework is the treatment of on-farm diversified uses. Under the Provincial Planning Statement, 2024, an OFDU is a secondary use on a farm property that is compatible with and does not hinder the surrounding agricultural operations. OFDUs in Prince Edward County are limited to the lesser of 1 hectare (2.47 acres) or 2% of the total lot area. This cap applies to the combined area of all OFDU buildings and operations on the property. Common OFDUs in the County include farm-gate retail, agri-tourism, event hosting, and small-scale processing. The limitation is important for winery and cidery operations that may want to expand their non-agricultural footprint: the 1-hectare or 2% cap includes the tasting room, retail area, event space, and any associated parking. Exceeding this limit requires a rezoning application.
Wineries, Cideries, and the Tied House Definition
Prince Edward County’s wine industry has driven significant construction activity, from new winery buildings to tasting rooms and event venues. The zoning by-law includes a “tied house” definition: the food-and-drink side of a winery, cidery or brewery, licensed by the Alcohol and Gaming Commission of Ontario, where you serve what you make on site. It’s permitted as an accessory use to the production on the same property. The building and site design must comply with both the agricultural zone provisions and the OFDU area limits. New winery construction typically requires a site plan agreement with the County, which addresses parking, access, servicing, stormwater management, and landscaping. The site plan process adds time and cost but is a standard part of commercial development in the agricultural zone.
Agricultural Building Exemptions
Buildings that are used exclusively for agricultural purposes (barns, driving sheds, grain storage, livestock housing) are exempt from Part 3 of the Ontario Building Code, which covers fire protection and occupant safety. They still require a building permit, but the design requirements are less onerous than for buildings with human occupancy. The exemption applies only if the building is genuinely agricultural in use. If a barn or agricultural building is later converted to non-agricultural use (event space, workshop, studio, or residential), it must be brought up to the applicable sections of the OBC for the new occupancy classification. This conversion often involves structural upgrades, fire separation, accessibility requirements, and updated mechanical systems.
Conservation Authority and Shoreline Development
Any new construction near the Lake Ontario shoreline, the Bay of Quinte, or inland water bodies will require a permit from Quinte Conservation if the property falls within a regulated area. Under Ontario Regulation 41/24, regulated areas include floodplains, erosion and dynamic beach hazards, and land within 30 metres of a wetland. The County’s south shore along Lake Ontario includes areas of dynamic beach and bluff erosion, where development setbacks are measured from the projected erosion line, not the current shoreline. These setbacks can be substantial and should be confirmed through a site-specific assessment before committing to a building design or location.
Development Charges and Costs
New residential construction in Prince Edward County is subject to development charges under the County’s development charge by-laws (35-2023 to 41-2023, as amended in 2024). These charges fund growth-related infrastructure including roads, water, and community services. Rates are indexed every January, so check the current development charge rules or ask the Building Department before you budget. Development charges are payable at the time the building permit is issued. Combined with the building permit fees, site plan application fees (where applicable), and conservation authority permit fees, the soft costs of a new construction project in the County can run to tens of thousands of dollars before any construction begins. Factor these into the project budget early.
